stable-diffusion-webui/docs/milestones/M12/M12_run2.md

1.0 KiB

M12 CI Run 2 — Post-Merge Quality Tests

Date: 2026-03-13
Branch: main
Merge: Fast-forward to 46cf6d1c (m12-runner-instrumentation)
Trigger: push to main
PR: None (gh pr create failed; merged directly)


1. Workflow Identity

Workflow Run ID Trigger Status
Linter 23037656356 push ✓ success
Quality Tests 23037656379 push ✓ success

2. Run 1 → Run 2 Delta

Run 1 (M12_run1.md): Placeholder; PR not created (gh GraphQL error). Merge performed directly.

Run 2 (23037656379): Quality Tests passed on push to main after merge. All checks green. Duration ~3m34s.


3. Quality Tests Summary

Check Result
Smoke tests
Quality tests
Coverage ≥40% gate satisfied
verify_pinned_deps
pip-audit Informational (M27)

4. Verdict

CI Status: ✓ Green — All post-merge checks pass.

M12 closeout can proceed: summary, audit, ledger, tag.