1.0 KiB
1.0 KiB
M12 CI Run 2 — Post-Merge Quality Tests
Date: 2026-03-13
Branch: main
Merge: Fast-forward to 46cf6d1c (m12-runner-instrumentation)
Trigger: push to main
PR: None (gh pr create failed; merged directly)
1. Workflow Identity
| Workflow | Run ID | Trigger | Status |
|---|---|---|---|
| Linter | 23037656356 | push | ✓ success |
| Quality Tests | 23037656379 | push | ✓ success |
2. Run 1 → Run 2 Delta
Run 1 (M12_run1.md): Placeholder; PR not created (gh GraphQL error). Merge performed directly.
Run 2 (23037656379): Quality Tests passed on push to main after merge. All checks green. Duration ~3m34s.
3. Quality Tests Summary
| Check | Result |
|---|---|
| Smoke tests | ✓ |
| Quality tests | ✓ |
| Coverage | ≥40% gate satisfied |
| verify_pinned_deps | ✓ |
| pip-audit | Informational (M27) |
4. Verdict
CI Status: ✓ Green — All post-merge checks pass.
M12 closeout can proceed: summary, audit, ledger, tag.